Start with the Notice of Availability
A Notice of Availability tells the owner that municipal utilities are available and that deadlines or connection requirements may apply. It does not by itself define the private-property plumbing route or the contractor's complete scope. Keep the notice, property survey, utility correspondence, and any available septic information together for the site review.
The plumber needs to understand where the new service points are, how the building is currently supplied, which irrigation zones or hose connections must remain active, and where the existing septic system sits in relation to the proposed work.
One project, several responsibilities
The job can involve potable water piping, a new main shutoff, sanitary sewer piping and cleanouts, irrigation service, separation from the former well system, septic pumping and abandonment, permits, inspections, and site restoration. Some elements may require a septic contractor, electrician, utility representative, or other specialist in addition to the licensed plumbing contractor.
The cleanest customer experience comes from a written responsibility table: who performs each task, who schedules it, what fees are included, and what must occur before the next stage begins.
Protect the property and the schedule
Before excavation, identify gates, pavers, driveways, landscaping, irrigation, docks, buried lines, pets, and known environmental restrictions. A shorter route is not always the best route if it creates avoidable damage or poor future access.